Partial outage from 3:18 PM to 4:22 PM, Operational from 4:22 PM to 4:55 PM

Grand Rapids (GRR) Voice

Partial outage from 3:18 PM to 4:22 PM, Operational from 4:22 PM to 4:55 PM

Updates
  • Update
    Update

    MIR now available for Loss of Communication to GRR Server

     

    At 10:30am ET, our monitoring system alerted us to the GRR server being unreachable for two minutes, resulting in device registrations and inbound calls to failover to other servers. Shortly after, the same datacenter lost communication again.

     

    What Was Affected: GRR Server

    When It Began: 6/04/2025 10:30 AM ET

    Resolution: 

  • Resolved
    Resolved

    At 10:30am ET, our monitoring system alerted us to the GRR server being unreachable for two minutes, resulting in device registrations and inbound calls to failover to other servers. Shortly after, the same datacenter lost communication again.

    What was Affected: GRR Server

    When It Began:  10:30 AM ET

    Current Status:

    • We continue to see stability on GRR's connections after 24 hours of monitoring.

    • This incident is now considered Resolved.

    Next Steps:

    • Major Incident Report will be available within 48 hours.

  • Update
    Update

    Current Status: At this time we continue to see stability on GRR's connections. The datacenter will be performing maintenance and repair to the MPLS configuration tonight at 2AM and is expected to be completed before 8AM. No downtime or service interruptions are expected. Our NOC will be monitoring throughout the monitoring phase.

    Next Steps:

    • Continue to monitor

    • Maintenance: Tonight, 2:00 - 8:00 AM ET

    Next Update: 1:15 PM ET 6/25/2025

    Degraded Services: None

    Operational Services: All

  • Monitoring
    Monitoring

    What Is Affected: GRR Server

    When It Began: 10:30 AM ET

    Current Status: We have determined that the loss of traffic was due to a degraded circuit. The offending circuit was removed from the routing profile. Traffic has remained stable since the change. Moving to the monitoring stage.

    Next Steps: Continue to monitor

    Next Update: 6/5/2025 1:15 PM ET

    Degraded Services: None

    Operational Services: All

  • Investigating
    Investigating

    At 10:30am ET, our monitoring system alerted us to the GRR server being unreachable for two minutes, resulting in device registrations and inbound calls to failover to other servers. Shortly after, the same datacenter lost communication again. We are investigating quickly and will determine if we need to close GRR temporarily. Updates to follow

    What Is Affected: GRR Voice

    When It Began: 10:30 AM ET

    Current Status: We are investigating quickly and will determine if we need to close GRR temporarily.

    Next Steps: Updates to Follow